What Are The Two Construction Phases? Phase One - began late May 2004 - FINISHED! - Mechanical / Electrical / Plumbing work in the existing building. - Demolition of the former Student Publications space and the former Games Room in the UC Basement. - Construction of the new Post Office in the space formerly occupied by Student Publications and the Game Room. - Construction of a new loading dock and elevator to service the new Post Office and service tunnel. - Utility work on the areas surrounding the existing building. - Expansion of the existing mechanical building on the south of the UC to accommodate the new AC equipment. - Work needed to make the Alumni Center a stand-alone building. Phase Two - scheduled to begin January 2005 and lasting 22-24 months - Demolition of the existing one-story portion of the UC. - Construction of three (3) new floors on this site. - Closing of Alumni Drive from the north end of the new building to approx. where the bookstore doors are on the existing building. - Construction of turnarounds at either end of Alumni Drive. - Landscaping the area between the Student Center and the Academic Core as a pedestrian plaza. Note: All of the dates and schedules shown above are subject to change based on weather conditions, availability of materials, etc. | |||||
SFA Office of Student Affairs
osa@sfasu.edu
Date Last Modified: 1/13/05
©2003-05